• ABOUT
  • PROJECTS
  • NEWS
  • CONTACT

SOLATECT Design + Build

  • ABOUT
  • PROJECTS
  • NEWS
  • CONTACT
Menu

Copyright © 2019 Solatect Design + Build, LLC

post1-1 post1-2 post1-3
Uncategorized |

March 24, 2015

| Levi Salazar

Work has started at Decatur Glass

The site improvements at Decatur Glass have started.  Improvements include a new deck, ramp and concrete landings.

Post navigation

Older Newer

Comments are closed.

Recent Posts

  • 853 PONCE HAS BEEN ROUGHED IN
  • Blue Ridge Pharmacy construction is moving along.
  • Framing is nearing completion at 853 Ponce
  • Construction has started at the Blue Ridge Pharmacy
  • Construction is moving along in McCaysville

Categories

  • Uncategorized (11)
  • UNDER CONSTRUCTION (8)